Fire safety audit, health & safety audit, risk assessment Medical examination, Noise Survey, EIA & EA Audits, First Aid Training, Fire Safety Trainings, Refresher Trainings and Tailor-Made Safety Seminars.

Core values
Credibility
Excellence
Teamwork
Innovativeness

 

Fire Equipment Maintenance:The Basics

E-mail Print PDF
  • Co2 Gas Extinguisher
Besides checking the extinguishers general body condition which normally has no problem as the extinguisher is of solid mild steel, and seeing that the valve is intact. The only service required for this type of extinguisher is to physically weigh it and confirm its weight. The extinguisher has indents indicating empty weight, gross weight and content capacity.
  • Hose Reels
Reel out the tubing to check for any cracks or kinking- if any is noticed and is extensive- change the tubing.
Open Gate Valve (it should always be opened anyway) and open the nozzle and test the spray (jet settings and closing. No leakages should be evident when in closed position.
The reels axle kits should not be leaking. If any leakage is observed-change the axle kits and if it’s the nozzle change it.
The pumps should also be tested by seeing that it opens and shuts as you work the hose reels. It should automatically start upon dropping of the pressure in the system and closing upon reaching the standby pressure. Further checks to the pump should see that the brushes are full and there’s no sparking or leakages within the pump connections and that the pressure gauge stops at the recommended settings.
  • Landing Valves/Inlet Breechings
These are visually checked to see that the locking mechanism is working properly with a hitch and that instantaneous coupling of the delivery hose is done as such and that there is no jamming. If  locking mechanism is faulty – it should be changed. The washer should also be locked so that it is seen to be intact and not cracked.
  • Fire Blankets
These are drawn out and their state generally observed that they are not torn or have fungal growth. They should be brushed folded and returned to the container.
  • Delivery Hoses
These should be rolled out and check for any damage or cuts and the locking mechanism tested for instantaneous coupling action. Once a year they should be pressure tested, dried and returned to their positions.
  • Stand Pipes
These are tested by clamping them to the water hydrants, placing a blank cap and subjecting it to water pressure. If it holds it ok washers at both ends are checked for cracks and the instantaneous coupling action tested.
  • Alarm System
Batteries – check for acidity levels i.e. ampheres
Panel – Blow dust the interior and test the indicator lamps all work by the test lamp switch. These will show the fire, fault etc lamp action.
test the general alarm for the bells or sounders and see that the call point triggers at the panel and the fire lamp comes on indicating the zone properly. Then using the panel key this is cancelled and returned to stand by position. This is repeated to each call point.
  • Detectors
These are triggered individually and they should trigger the panel. (The test is same for call points).
  • Sprinkler System/Wet Riser System
The pumps are tested to comply with the manufacturers operation regime and all the settings recorded in a test record schedule (as sample provided). The sprinkler system is opened through an end of line test valve and the alarm should sound as well as the pump should kick as required.
Last Updated ( Friday, 14 February 2014 07:18 )  

Mission

To foster partnership to provide excellent and affordable fire service delivery.

Our Vision

To be the premier organization for fire service delivery in Africa.

Who's Online

We have 1 guest online

Get Connected